Pharmacy Hall Addition News

Monday, December 22, 2008

Dean Eddington visited the construction site today, climbing down the ladder to investigate the newly poured concrete foundation.

Friday, December 19, 2008

The second half of the foundation has been poured. Column formwork is being constructed in anticipation of concrete columns being placed to support the first floor of the building.


Wednesday, December 10, 2008

The completed crane!

Concrete and Cranes

Monday, December 08, 2008

The concrete foundation for the building has been poured over two-thirds of the site. The tower crane is being assembled and will measure over 200 feet tall with a boom section which is approximately 160 feet long. It will be in place for about nine months. Visit our construction blog at http://www.pharmacy.umaryland.edu/ to see pictures.

Tuesday, December 02, 2008

Bottom bars are being installed throughout the entire footprint of the Addition. These bars support drain piping, which will be installed next. Once the drain piping is in place and has been tested, the top bars will be installed and concrete will be poured.