Friday, September 04, 2009
Exterior wall framing on the west and north sides of the building is complete at the penthouse level (purple wall area on the north elevation photo), and the brick is following the wall framing. Brick will reach the top of brick/masonry elevation today on the west side with the precast concrete top of wall pieces that get set on top of the brick will happen next week. Exterior brick is currently at the penthouse floor level on the south and north sides of the building.