Pharmacy Hall Addition News

Thursday, May 20, 2010

Pharmacy Hall Addition 4th Floor Inspections took place on May 19, 2010. While a few hundred items were identified that need repair/correction/testing, the space looks good. Attached are a few pictures of the 4th floor along with some others. 5th Floor Inspection takes place on Friday.

Lab looking out onto spacious write up area


3rd Floor Classroom with Built-in desks


Wood Paneling being installed in 200 seat lecture hall


Typical Lab Module


Typical Faculty Office (There is wood paneling under the window sill)


Office hallway in background as Pam Crowe discusses issues with campus inspector